Czech Republic (Strážnice)
Installation on a small area between the building and the scale.
Czech Republic (Bošilec)
Installation of VV06 with underground transport route.
Czech Republic (Ivančice)
Installation with a longer overhead route, traffic light equipment, sample divider and back transport.
France (Fay de Bretagne)
First BioPro grain sampler in France, underground tubing till laboratory.
Czech Republic (Bohušovice nad Ohří)
Installation far from the laboratory, longer above-ground transport route.
Czech Republic (Chotěboř)
Underground hose line under scales, traffic light installed on the sampler column.
Czech Republic (Uničov)
The sampler is built on the other side of the scale than the laboratory - transport route through the structure above the scale.
Ukraine (Cherkasy)
Tube on-line sampler with control panel.
Ukraine (Zaporizhzhya)
An auxiliary structure was built - the upper sample transport line.
Ukraine (Poltava)
Installation without a sample divider, ends only with a cyclone in the laboratory.
Ukraine (Cherkasy)
The current structure is used as support for the transport route.
Ukraine (Kirovograd)
Problem of long transport route is solved with the help of a supporting structure. Without sample divider.
Russia (Leningrad)
Installation inside the building, sampling from trains.
Russia (Novosibirsk)
Installation in extreme winter conditions.
Ukraine (Kyiv)
Two grain samplers located behind each other - one receiving point.
Ukraine (Kyiv)
A very long transport route placed above the ground. Sampling is based on the image on the monitor display.
Ukraine (Poltava)
The current structure was used for the transport route of the sample.
Ukraine (Vinnytsia)
Standard sampler installation.
Ukraine (Vinnytsia)
A cyclone for sample collection located outside the laboratory on the outside of the building.
Ukraine (Chernihiv)
Installation of the sampler next to the auxiliary ladder.
Ukraine (Rivne)
Due to the increased weight, the sampler is placed on a higher concrete foundation.
Ukraine (Rivne)
Installation in the immediate vicinity of the laboratory without an auxiliary transport structure.
Ukraine (Poltava)
Sample collection outside the laboratory, located next to the scale.
Czech Republic (Marefy)
Automatic version - specific colour design as per request.
Czech Republic (Havlíčkův Brod)
Untypicall installation at the space limited area.
Czech Republic (Kaplice)
Typical installation between the weightbridge and the lab.